Final Project Update: “Lot 2” / Mitchell Heating – Ground – Up

Facebook
Twitter
LinkedIn

“Lot 2” / Mitchell Heating – Office/Warehouse

ADDRESS: 1150 Meadowbrook Parkway, Colorado Springs, CO

COMPLETION DATE: February 2019

SQUARE FOOTAGE: 12,500 SqFt

STRUCTURE TYPE: Office Warehouse Metal Building

“Lot 2” was designed and built as a spec building with intentions for Mitchell Heating to occupy the space. Mitchell Heating will be in the building near the end of March 2019. The building will house their mechanical division for sheet metal fabrication. The building features a 16-foot Evite and 12-foot x 14-foot overhead doors for optimal moving space. The generous size of the warehouse will be perfect for Mitchell Heating’s heating ductwork division to operate.

mitchell heating exterior facing south east
mitchell heating building exterior facing east
mitchell heating overhead door exterior facing south
mitchell heating exterior with mountains in background
mitchell heating interior office space
mitchell heating interior office area
mitchell heating warehouse interior
mitchell heating warehouse area interior
mitchell heating overhead doors interior


Connect With Us

Thank you for checking out our blog. We hope you enjoyed it and ask that you please share it!

Facebook

Instagram

Portfolio

About Hammers Construction

Over 60 years ago, Steve and Dave Hammers’ father began a commercial construction company in Northern Minnesota. Steve and Dave are carrying on the family tradition and passion for design-build construction. In 1986, the business bearing the family name, expanded to the Rocky Mountains. In 1991, Hammers Construction, Inc. (HCI) became an independent entity in Colorado Springs, CO. Over the years, HCI has earned a reputation for honesty, integrity, and professionalism in the very unique design-build construction industry.

Email Sign Up