Well .. once again we had some crazy weather here this week! Goodness! We hope you stayed safe and warm!

Please enjoy all of the progress from this weeks commercial construction projects in Colorado Springs, Colorado and Denver.

HAPPY FRIDAY!

Mineralife New Building Remodel – Remodel Colorado Springs, Colorado

North Range Eye Care – Design/Build Construction in Denver, Colorado. Stay Tuned for Final Photos soon!!

Peak Gymnastics – Falcon, Colorado

Tender Care Vet – Addition in Falcon, Colorado

Apex Audiology – Colorado Springs, Colorado

Gripstone – Colorado Springs, Colorado

First National Bank Flying Horse – Colorado Springs, Colorado

First off! We would like to apologize this week for not having been able to post our weekly update on Friday. That being said… HAPPY SUNDAY!

Apex Audiology – Ground – Up in Colorado Springs, Colorado

KOA Camp Ground – Tenant Addition/Remodel in Colorado Springs, Colorado

North Creek Restrooms – Tenant Remodel in Colorado Springs, Colorado

Hemp Depot – Tenant Remodel in Colorado Springs, Colorado

Gripstone – Design – Build Construction in Colorado Springs, Colorado

Lot 3 – Pre-Engineered Metal Building in Colorado Springs, Colorado

Hammers Construction proudly serves the Colorado Springs and Denver Areas as well as North Dakota.

It has been a very cold and rainy May week here in Colorado! We have made progress on our jobs none the less!

Hammers Construction proudly serves Colorado Springs, Denver, and North Dakota.

Gripstone – Design/Build Project in Colorado Springs, Colorado.

First National Bank – Flying Horse – New Construction in Colorado Springs, Colorado.

CSAA – Tenant Remodel in Colorado Springs, Colorado

Apex Audiology – Design-Build Project in Colorado Springs, Colorado

North Range Eye Care – Design-Build Construction in Denver, Colorado

Lot 3 – Pre-Engineered Metal Building in Colorado Springs, Colorado

Kermit Kare – Tenant Remodel Colorado Springs, Colorado

Hemp Depot – Tenant Remodel in Colorado Springs, Colorado

CSAA – Tenant Remodel in Colorado Springs, Colorado

First National Bank Flying Horse – Design – Build Construction in Colorado Springs, Colorado



Gripstone – Design – Build Construction in Colorado Springs, Colorado

Lot 3 – Pre-Engineered Metal Building in Colorado Springs, Colorado

North Creek Bathroom Remodel – Tenant Remodel in Colorado Springs, Colorado

Peak Gymnastics – Pre-Engineered Metal Building Colorado Springs, Colorado

Happy Friday!

This weeks progress will show two weeks of time. We have made some great progress and are looking forward to having some of our projects getting close to the finish!

Hammers Construction proudly serves all of the Colorado Springs & Denver area!

Apex Audiology – Medical Ground- Up in Colorado Springs, Colorado

First National Bank – New Bank in the Flying Horse Community of Colorado Springs, Colorado.

Gripstone – New Climbing Gym in Colorado Springs, Colorado



Lot 3 – Design-Build in Colorado Springs, Colorado

Tender Care Vet Clinic Addition – Colorado Springs, Colorado

Peak Gymnastics – New Gymnastics studio in Falcon, Colorado

North Range Eye Care – Denver, Colorado

Lot 3 is a ground-up spec building in Colorado Springs, Colorado.


Apex Audiology is a ground-up wood-framed building in Colorado Springs, Colorado.


Gripstone is a metal-framed climbing gym in Colorado Springs, Colorado.


North Range Eye Care is a ground-up building in Commerce City Colorado.


Tender Care Vet Clinic is a design build addition in Falcon, Colorado.


CSAA is a Tenant Remodel in Colorado Springs, Colorado.


Peak Gymnastics is a ground-up metal building in Colorado Springs, Colorado.

It’s April! Here is to a productive month ahead! We have lots going on during the month of April.



Tender Care Vet Clinic – Existing Building Add-On in Falcon, Colorado

We are adding on to Tender Care Vet Clinic that we build previously. This project is moving along nicely.


North Range Eye Care – Ground – Up in Commerce City, Colorado

North Range Eye Care is a ground-up in Commerce City, Colorado. We are in the final stages of the building process and hope to finish up soon!


Peak Gymnastics – Ground-Up Falcon, Colorado

Peak Gymnastics is moving along nicely. We are excited to have poured the first slab and finished the pits.


Gripstone – Ground-Up Colorado Springs, Colorado

Gripstone is a ground-up building in Colorado Springs. The foundation was poured this week and we are going to be cranking away at getting the rest of the building process going over the weekend and into the next week.




Apex Audiology – Medical Ground – Up Colorado Springs, Colorado

Apex Audiology is getting near the final stages of building. Interior work has started and work outside is ongoing.


Lot 3 – Ground-Up Colorado Springs, Colorado


Woodford – Ground-Up Colorado Springs, Colorado

We are happy to have handed over the building to the owners. Congrats! And thank you so much for working with us.


Than you all for your continued support of Hammers Construction!

Can you believe it is already the last week in March? We are looking forward to April and the warm months ahead.

Woodford – Ground-Up Addition in Colorado Springs, Colorado


Apex Audiology – Ground- Up Colorado Springs, Colorado


Lot 3 – Ground-Up Project in Colorado Springs, Colorado

Happy Friday!

We finally avoided snow here in Colorado this week and were able to get lots of work done. Check out the progress!

CSAA – Tenant Improvement Colorado Springs, Colorado

CSAA has their new carpet installed this week along with LVT. Our team was also able to complete the drywall finish and applied the base coat of paint.




North Range Eye Care – Ground – Up Commerce City, Colorado

NREC, on the outskirts of Denver, is in the interior stages of the design-build construction process. Insulation was completed along with the vapor barriers being installed and inspected. The brown coat of the stucco was applied and is now finished, also were able to install gas lines.


Gripstone – Ground-Up Metal Building in Colorado Springs, Colorado

We specialize in metal buildings and Gripstone is no exception! Our structural steel was delivered and staged and the foundation was prepped this week with underground utilities. We laid two-inch copper waterlines and fire lines that were then inspected and back-filled as well.


Apex Audiology – Medical Ground-Up in Colorado Springs, Colorado

Apex Audiology is a commercial medical building. This week at Apex we had concrete poured for their trash enclosure, sidewalks, curbs and gutters. The electrical transformer pad and underground conduits were installed. Steel framing was installed in the interior of the building. Steel erection is ongoing with welding being completed along with the wood framing and additional blocking for steel.


It’s Friday!

We have had some crazy weather this week in Colorado with the #bombcyclone causing road shutdowns and delays on many job-sites. The snow did not stop all the progress though.

Check out this week’s work along with a couple pictures of the aftermath of the snow!

An employee’s driveway.

Dave’s drive in to work.

Apex Audiology – Ground-Up Project in Colorado Springs, Colorado

Our crew was able to get a lot done this week on the Apex job-site despite the snow we received here. The interior steel framing was completed along with the installation of wood framing beam pockets for exterior steel. We are using red iron structural and architectural steel for the exterior. Also, we were able to start pouring curbs and gutters. The rooftop curbs were framed and penetrations for mechanical made.


Gripstone – Ground-Up Project in Colorado Springs, Colorado

This week at Gripstone there was foundation prep with additional blankets and sand bags laid for the winter storm, but the snow did not stop our deliveries. We had nine semi loads of structural steel delivered and staged.

North Range Eye Care – Ground-Up in Commerce City, Colorado

NREC passed their electrical and framing inspections this week. Snow and having to clear snow delayed work.

Woodford – Ground-Up Project in Colorado Springs, Colorado

Woodford had crane rails installed and footers poured for retaining walls on the loading dock pad. We also dug trenches for poles and completed pipe runs. Lastly, we completed the installation of the HVAC system.